Geospatial Information and Solutions for the Americas

A Digital Twin for the First Line of the Metro of Bogotá

Metro 1 S.A.S company owning the concession needed to generate a digital twin like model of the full corridor with all the physical elements in a very short period of time.

This is the base information that has been used to carry out the construction of the Metro of Bogota

SIGLA carried out the full detailed survey study before construction of the first line of the Metro of Bogota. We provided a full 3D model of the route for posterior civil engineering work. Project has been completed in a record time, 5 months. One of the most detailed models ever created.


Execution Period: 12/2020 to 05/2021
Tools: Project consisted in aerial and field work using laser scanners, bathymetries, cameras and a 50 people involved in the project during 5 months executed in difficult conditions due to Covid19 and a record time. We have generated a complete model and data that will be used in posterior phases.

Share in your RRSS

Picture of SIGLA
SIGLA